A GPU earns rent by the hour and costs a price up front. Dividing a year of rent by the price gives one number that says how fast the hardware can pay for itself. This note defines that ratio, works it through with public prices and shows what moves it. It also sets out how the Rillor Compute Index defines its Rent-to-Value series.
The ratio
Rent-to-value is a year of rent for one GPU divided by one GPU's share of the system price:
Rent-to-value = (hourly rate per GPU × 8,760) ÷ (system price ÷ GPUs per system)
Methodology v1.1 of the Rillor Compute Index defines RCI Rent-to-Value the same way: a year of rent for one GPU at the published rate, divided by one GPU's share of a comparable system's price, by GPU class [1]. A ratio of 1.0 means a year of rent at that rate equals the price of the hardware. Operators annualize the same way. IREN computes annualized revenue from contracted GPU-hour prices multiplied by 8,760 hours [16].
A worked example
The example below uses prices as shown on 9 October 2026. It is an illustration of the arithmetic, not an RCI value.
For hardware, we use one public listing per class: a Supermicro HGX B200 eight-GPU server at $384,228 [5] and an HGX H200 eight-GPU server at $293,354 [6], both at Newegg and both out of stock. For rent, we use each provider's published on-demand price per GPU-hour (Lambda's and CoreWeave's for eight-GPU instances, Nebius's from its per-GPU price list): Lambda, CoreWeave and Nebius for the B200, CoreWeave and Nebius for the H200 [2, 3, 4], and CoreWeave's spot price [3].
| B200 | H200 | |
|---|---|---|
| Listed system price, 8 GPUs | $384,228 | $293,354 |
| Price per GPU | $48,028.50 | $36,669.25 |
| On-demand rate, median across providers | $8.50 | $5.85 |
| Rent-to-value at the on-demand rate | 1.55 | 1.40 |
| CoreWeave spot rate | $4.26 | $2.62 |
| Rent-to-value at the spot rate | 0.78 | 0.63 |
At posted on-demand prices, a fully rented B200 would earn its listed price in about eight months. That figure is a ceiling. On-demand rates are list prices for capacity with no commitment, and SemiAnalysis reported that most of the rental market trades on contracts of six months or longer [20]. CoreWeave offers up to 60% off its on-demand prices for committed usage [3]. Applied to its own B200 rate, that discount takes the ratio to 0.63. At contract level, IREN's five-year Microsoft contract for GB300 systems, $9.7 billion or about $1.94 billion a year, against about $5.8 billion of equipment and services gives about 0.33 [15].
From ratio to payback
Three adjustments turn the posted ratio into a payback estimate.
Utilization and discount. The realized ratio is the posted ratio times the share of hours sold times one minus the discount. A posted 1.55 at 60% utilization and no discount is 0.93.
Operating cost. Power is the one cost every GPU carries. We use NVIDIA's figure for its DGX B200, up to about 14.3 kW for eight GPUs, as a proxy [7]. With the 2025 weighted average power usage effectiveness of 1.54 reported by Uptime Institute survey respondents [9] and the 2025 U.S. average industrial electricity price of 8.51 cents per kWh [8], one B200 at full draw costs about $2,052 a year, or 4.3% of its share of the listed price. Space, networking, staff, software and insurance add more, and vary by operator.
Price path. Rents move. AWS cut On-Demand prices for its H100-based P5 instances by 44% from 1 June 2025 [17]. One-year H100 contracts then rose from $1.70 to $2.35 per GPU-hour between October 2025 and March 2026 [20], and Nebius raised its on-demand list prices from 1 October 2026 [4].
With power as the only cost, a realized ratio of 0.5 pays back in about 2.2 years if rents hold, and 2.8 years if they fall 15% a year. At 0.33 the same cases take 3.5 and 5.9 years.
The hurdle set by depreciation and debt
Operators depreciate GPU servers over five to six years [10, 11, 12], which charges 17% to 20% of the price each year. Financing adds interest. IREN reported GPU financing at 6.0% with an investment-grade customer and 9.0% with non-investment-grade customers, the latter funding 90% of the related GPU spending [16]. On those terms, first-year interest on 90% of the price is 5.4% or 8.1% of it. Add power at 4.3%, and a realized ratio somewhere between 0.26 and 0.32 is needed just to cover depreciation, power and first-year interest. A posted ratio of 1.55 leaves room for low utilization and deep discounts. A contract ratio of 0.33 leaves little.
What the ratio does not tell you
The ratio says nothing about what the hardware is worth when the first contract ends. KBRA frames that question as whether customers keep using the capacity at an attractive price after the original term [21]. Accounting lives give one reference: Amazon shortened a subset of server lives from six years to five from January 2025, citing the pace of technology development in AI and machine learning [13], while Meta extended most server lives to 5.5 years [14].
How RCI Rent-to-Value is built
RCI Rent-to-Value combines two other series in the index [1]. Under the methodology, its rent comes from RCI Rental, which uses published prices from provider pricing APIs and pages by GPU class, region, term and pricing type, with hyperscalers and neoclouds shown separately. Its price comes from RCI Hardware, which uses listings, quotes and reported sales of GPU systems by comparable grade, each tagged with its evidence class, with air-cooled and liquid-cooled builds graded separately. Each series takes the median for each provider, then the median across providers. Rillor's own quotes and agreements are excluded from every published series, and the methodology sets the data rules a series must meet before a value is published [1].
Read the full report
The full report, with every input and its source, the payback and hurdle tables and the complete source list, is available as a PDF.