Vendor figures put an NVL72 rack at 120 to 142 kW, against about 11 kW for a typical rack, and that gap changes cooling, power and colocation pricing.

Cover of the full report: Rack power and liquid cooling: what NVL72 changed
The research behind this article, with every source listed. 16 pages.

Key points

From the Summary of the full report

  1. Typical rack densities in operating data centers sit between about 7.5 kW and 11 kW, depending on the survey year and on whether high-density sites are counted. Uptime Institute's 2025 survey put the average of operators' typical (modal) rack densities at almost 9 kW, or 7.5 kW without facilities with typical density of 30 kW or more [1]. Reporting on the 2026 survey gives a modal density of 11 kW, and an average of 7.8 kW without a small number of facilities designed for more than 30 kW [2].
  2. A GB200 NVL72 rack draws approximately 120 kW according to NVIDIA's documentation [7], with vendor figures from 125 kW to 135 kW for configured racks [9], and a reference design for GB300 NVL72 supports up to 142 kW per rack [10].
  3. Power per GPU changed little. Derived from vendor figures, an air-cooled DGX B200 draws about 1.8 kW per GPU and a GB200 NVL72 rack about 1.7 kW per GPU [5, 7]. What changed is the number of GPUs in one rack: 72 in an NVL72, against 16 in two air-cooled DGX B200 systems, the typical deployment in NVIDIA's guidance [5].

Typical data-center racks still draw single-digit or low double-digit kilowatts [1, 2]. In Uptime Institute's 2026 survey, the modal rack density reported by operators reached 11 kW, and the average was 7.8 kW once a small number of facilities designed for more than 30 kW are set aside [2]. NVIDIA's documentation puts a GB200 NVL72 rack at approximately 120 kW [7], and Schneider Electric's reference design for GB300 NVL72 clusters supports up to 142 kW per rack [10].

That is a jump of more than ten times in one cabinet. This explainer covers what drives it, how liquid cooling handles it, what it means for colocation contracts priced per kW-month and what a site needs before the racks arrive.

Same power per GPU, more GPUs per rack

System Cooling Power GPUs Power per GPU (derived)
DGX H100 [4] Air, 8U 10.2 kW max 8 1.3 kW
DGX B200 [5] Air, 10U 14.3 kW max 8 1.8 kW
DGX B300 [6] Air, 10U 14.5 kW 8 1.8 kW
GB200 NVL72 rack [7] Liquid for compute, air for the rest About 120 kW 72 1.7 kW
GB300 NVL72 rack, reference design [10] Liquid Up to 142 kW 72 2.0 kW

Per GPU, a Blackwell system draws about the same in an air-cooled 8-GPU server as in an NVL72 rack. The change is how many GPUs share one rack. NVIDIA's planning guidance for the air-cooled DGX B200 puts two systems in a rack in a typical deployment, 28.6 kW, and four only at sites designed for extreme-density air cooling, 57.2 kW [5]. An NVL72 rack holds 72 GPUs, linked by NVLink through a copper cable backplane so the rack works as one domain [7]. NVIDIA describes that design as delivering a full-rack power density of 120 kW [3].

Why air runs out

Air carries heat poorly compared with liquid [3]. NVIDIA's DGX B200 guidance budgets about 150 cubic feet per minute of supply air per kilowatt, and up to about 2,145 CFM for each system [5]. Applied to a 120 kW rack, the same ratio gives 18,000 CFM through one cabinet (derived). NVIDIA's own description is blunter: to cool racks at these power levels with air alone, the air would need to be cooled below freezing or moved at near-gale speeds [3].

ASHRAE's data-center committee flagged the trend in 2021, when it recommended that any future data center include the capability to add liquid cooling [13].

Three kinds of liquid cooling

The U.S. Department of Energy's best-practice guide for data-center design sorts liquid cooling into three classes [12]:

  • Close-coupled air-to-liquid. A coil at the rack, such as a rear-door heat exchanger, captures server heat into liquid. Doors can be active, with their own fans, or passive.
  • Cold plates. Fin heat sinks on the chips are replaced by plates with liquid flowing through channels, usually served by a coolant distribution unit (CDU).
  • Immersion. Electronics sit in a dielectric fluid, either pumped as a liquid (single-phase) or boiled and condensed (two-phase).

Cold plates and immersion count as direct liquid cooling [12]. Many systems are hybrids: liquid removes the majority of the heat, and room air removes the rest [12]. The NVL72 is one of them. Its compute trays are cooled by liquid running through manifolds to cold plates on the CPUs and GPUs, while networking and storage are air-cooled [7].

A CDU sits between the rack and the building. It connects to the facility cooling loop and supplies liquid at the temperature, pressure and chemistry the IT equipment needs [12]. ASHRAE names its liquid-cooling water classes by their upper temperature limit in degrees Celsius: W17, W27, W32, W40, W45 and W+ [13]. Warmer water lets a site reduce or avoid mechanical chillers in many climates, and the higher classes can allow dry coolers [3, 12].

What changes in a colocation contract

Wholesale colocation is priced per kW per month. CBRE reported an average asking rate of $196.25 per kW per month for 250 to 500 kW requirements in primary North American wholesale markets in the second half of 2025 [17]. At that asking rate and before energy, a GB200 NVL72 rack at 120 kW comes to $23,550 a month, about $327 per GPU. A GB300 NVL72 rack at 142 kW comes to about $27,868, or $387 per GPU. A rack with two DGX B200 systems at 28.6 kW comes to about $5,613, or $351 per GPU. These are derived from the CBRE rate and vendor power figures [5, 7, 10], for illustration only.

Per-kW pricing makes rent track power per GPU, and power per GPU changed little across these systems. Density changes which sites can host the racks. CBRE reports that operators with facilities built for superintelligence (SI), including liquid cooling and high-power-density racks, captured rent premiums over standard colocation [17].

Three terms deserve attention in a contract for dense racks:

  1. Power provisioned and power drawn. NVIDIA's DGX B200 tables show the gap: two 60 A circuits at 415 V with breaker derating support 66 kW, and four systems peak at 57.2 kW, leaving 8.4 kW stranded [5]. Where rent is charged on provisioned capacity, the stranded kilowatts are paid for.
  2. Energy. Energy can be billed on top of rent. Digital Realty reports that the vast majority of its utilities expense is passed directly to customers [18].
  3. Cooling grade. Liquid-cooled capacity needs CDU capacity and a way to reject the heat, either facility water or liquid-to-air units that return it to the room [9]. Air-side options are not interchangeable either: NVIDIA's DGX B200 guidance says rear-door heat exchangers and in-row coolers are not typically suitable for that system [5].

Site readiness

Before an NVL72 rack arrives, a site needs:

  • A power path sized for the rack. NVIDIA's NVL72 rack uses eight power shelves of 33 kW each with N+N redundancy, converting AC to about 50 V DC on a rack busbar [7].
  • A liquid loop. CDU capacity matched to the racks, a facility water class the equipment accepts, and leak detection [7, 12]. Supermicro offers an in-rack 250 kW CDU, an in-row 1.3 MW CDU, and 180 kW or 240 kW liquid-to-air units for facilities without a cooling tower or water supply [9].
  • Air for the rest. Networking and storage still need air cooling [7].
  • Floor capacity. Dell lists a wet cabinet weight of 1,590 kg for its GB300 NVL72 rack, on a 750 mm by 1,200 mm footprint [15]. That is about 1,770 kg per square meter of rack footprint (derived).
  • Concurrent maintainability. NVIDIA's reference architecture says the data center should generally meet or exceed Uptime Institute Tier 3 or an equivalent standard, and specifies 1.2 MW of thermal design power for each scalable unit of 8 GB200 racks [8].

What comes next

NVIDIA says 54 V in-rack power distribution begins to hit physical limits as racks exceed 200 kW, and that a 1 MW rack at 54 V would need up to 200 kg of copper busbar [16]. Its stated plan is 800 V DC distribution to support 1 MW IT racks starting in 2027, alongside its Kyber rack-scale systems [16]. Capacity signed for 120 kW racks today sits on a path that NVIDIA expects to run much higher.

Read the full report

The full report, with the rack power data, the cooling and heat-rejection options, the per-kW arithmetic and the numbered sources behind every figure here, is available as a PDF.

The full report

Rack power and liquid cooling: what NVL72 changed

The research behind this article, with every source listed. 16 pages.

  1. Summary
  2. Background
  3. Data and method
  4. Findings
  5. Implications
  6. Limits of this analysis
  7. Sources

Sources

  1. Uptime Institute Global Data Center Survey 2025. Uptime Institute, 2025. https://datacenter.uptimeinstitute.com/rs/711-RIA-145/images/2025.Annual.Survey.Report.pdf
  2. AI Drives Data Center Uncertainty in Uptime's 2026 Survey (Sean Michael Kerner). Data Center Knowledge, 31 July 2026. https://www.datacenterknowledge.com/ai-data-centers/ai-drives-data-center-uncertainty-in-uptime-s-2026-survey
  3. Chill Factor: NVIDIA Blackwell Platform Boosts Water Efficiency by Over 300x (Marc Hamilton). NVIDIA Blog, 22 April 2025. https://blogs.nvidia.com/blog/blackwell-platform-water-efficiency-liquid-cooling-data-centers-ai-factories/
  4. Introduction to the NVIDIA DGX H100/H200 System, NVIDIA DGX H100/H200 System User Guide. NVIDIA, retrieved 9 October 2026. https://docs.nvidia.com/dgx/dgxh100-user-guide/introduction-to-dgxh100.html
  5. Data Center Best Practices with DGX B200. NVIDIA, retrieved 9 October 2026. https://docs.nvidia.com/dgx-pdf/nvidia-dgx-superpod-data-center-best-practices-with-dgx-b200.pdf
  6. Introduction to NVIDIA DGX B300, NVIDIA DGX B300 System User Guide. NVIDIA, retrieved 9 October 2026. https://docs.nvidia.com/dgx/dgxb300-user-guide/introduction-to-dgxb300.html
  7. Hardware, NVIDIA DGX GB Rack Scale Systems User Guide. NVIDIA, last updated 17 September 2026. https://docs.nvidia.com/dgx/dgxgb200-user-guide/hardware.html
  8. NVIDIA DGX SuperPOD: Next Generation Scalable Infrastructure for AI Leadership, Reference Architecture (DGX GB200). NVIDIA, retrieved 9 October 2026. https://docs.nvidia.com/dgx-superpod/reference-architecture-scalable-infrastructure-gb200/latest/_downloads/238ab33ee345a7241fc2f15eedc2ff6c/RA11338001-DSPGB200-ReferenceArch.pdf
  9. Supermicro NVIDIA GB200 NVL72 Datasheet. Super Micro Computer, Inc., 2025. https://www.supermicro.com/datasheet/datasheet_SuperCluster_GB200_NVL72.pdf
  10. Schneider Electric Announces New Reference Designs, Featuring Integrated Power Management and Liquid Cooling Controls, Supporting NVIDIA Mission Control and NVIDIA GB300 NVL72. Schneider Electric, 18 September 2025. https://www.se.com/ww/en/about-us/newsroom/news/press-releases/schneider-electric-announces-new-reference-designs-featuring-integrated-power-management-and-liquid-cooling-controls-supporting-nvidia-mission-control-and-nvidia-gb300-nvl72-68ca8fdd5e6c6f9d3a096133/
  11. Best Practices Guide for Energy-Efficient Data Center Design, revised July 2024. U.S. Department of Energy, Federal Energy Management Program, and National Renewable Energy Laboratory, July 2024. https://www.energy.gov/sites/default/files/2024-07/best-practice-guide-data-center-design_0.pdf
  12. Emergence and Expansion of Liquid Cooling in Mainstream Data Centers. ASHRAE Technical Committee 9.9, 2021. https://www.ashrae.org/file%20library/technical%20resources/bookstore/emergence-and-expansion-of-liquid-cooling-in-mainstream-data-centers_wp.pdf
  13. PowerEdge XE9712 Specification Sheet. Dell Technologies, retrieved 9 October 2026. https://www.delltechnologies.com/asset/en-us/products/servers/technical-support/poweredge-xe9712-spec-sheet.pdf
  14. NVIDIA 800 VDC Architecture Will Power the Next Generation of AI Factories (Mathias Blake, Martin Hsu, Ivan Goldwasser, Harry Petty and Jared Huntington). NVIDIA Technical Blog, 20 May 2025. https://developer.nvidia.com/blog/nvidia-800-v-hvdc-architecture-will-power-the-next-generation-of-ai-factories/
  15. North America Data Center Trends H2 2025. CBRE, 25 February 2026. https://www.cbre.com/insights/books/north-america-data-center-trends-h2-2025
  16. Digital Realty Trust, Inc., Annual Report on Form 10-K for the fiscal year ended December 31, 2025. U.S. Securities and Exchange Commission, filed 13 February 2026. https://www.sec.gov/Archives/edgar/data/1297996/000110465926015365/dlr-20251231x10k.htm

Notices

Rillor is not a registered investment adviser or commodity trading advisor and does not provide investment or trading advice. Research, forecasts, data and software described on this site are for research and engineering use. Nothing here is an offer or recommendation to buy or sell any security, commodity interest or digital asset. Past or simulated results do not indicate future results.

NVIDIA, AMD, Ceph, Kubernetes and related product names are trademarks of their owners and are used only to identify products. No affiliation or endorsement is implied.

Reserve power before the hardware arrives.

Send the GPU systems you plan to run, the block size and cooling you need, and the month you need power.

Discuss capacity