Typical data-center racks still draw single-digit or low double-digit kilowatts [1, 2]. In Uptime Institute's 2026 survey, the modal rack density reported by operators reached 11 kW, and the average was 7.8 kW once a small number of facilities designed for more than 30 kW are set aside [2]. NVIDIA's documentation puts a GB200 NVL72 rack at approximately 120 kW [7], and Schneider Electric's reference design for GB300 NVL72 clusters supports up to 142 kW per rack [10].
That is a jump of more than ten times in one cabinet. This explainer covers what drives it, how liquid cooling handles it, what it means for colocation contracts priced per kW-month and what a site needs before the racks arrive.
Same power per GPU, more GPUs per rack
| System | Cooling | Power | GPUs | Power per GPU (derived) |
|---|---|---|---|---|
| DGX H100 [4] | Air, 8U | 10.2 kW max | 8 | 1.3 kW |
| DGX B200 [5] | Air, 10U | 14.3 kW max | 8 | 1.8 kW |
| DGX B300 [6] | Air, 10U | 14.5 kW | 8 | 1.8 kW |
| GB200 NVL72 rack [7] | Liquid for compute, air for the rest | About 120 kW | 72 | 1.7 kW |
| GB300 NVL72 rack, reference design [10] | Liquid | Up to 142 kW | 72 | 2.0 kW |
Per GPU, a Blackwell system draws about the same in an air-cooled 8-GPU server as in an NVL72 rack. The change is how many GPUs share one rack. NVIDIA's planning guidance for the air-cooled DGX B200 puts two systems in a rack in a typical deployment, 28.6 kW, and four only at sites designed for extreme-density air cooling, 57.2 kW [5]. An NVL72 rack holds 72 GPUs, linked by NVLink through a copper cable backplane so the rack works as one domain [7]. NVIDIA describes that design as delivering a full-rack power density of 120 kW [3].
Why air runs out
Air carries heat poorly compared with liquid [3]. NVIDIA's DGX B200 guidance budgets about 150 cubic feet per minute of supply air per kilowatt, and up to about 2,145 CFM for each system [5]. Applied to a 120 kW rack, the same ratio gives 18,000 CFM through one cabinet (derived). NVIDIA's own description is blunter: to cool racks at these power levels with air alone, the air would need to be cooled below freezing or moved at near-gale speeds [3].
ASHRAE's data-center committee flagged the trend in 2021, when it recommended that any future data center include the capability to add liquid cooling [13].
Three kinds of liquid cooling
The U.S. Department of Energy's best-practice guide for data-center design sorts liquid cooling into three classes [12]:
- Close-coupled air-to-liquid. A coil at the rack, such as a rear-door heat exchanger, captures server heat into liquid. Doors can be active, with their own fans, or passive.
- Cold plates. Fin heat sinks on the chips are replaced by plates with liquid flowing through channels, usually served by a coolant distribution unit (CDU).
- Immersion. Electronics sit in a dielectric fluid, either pumped as a liquid (single-phase) or boiled and condensed (two-phase).
Cold plates and immersion count as direct liquid cooling [12]. Many systems are hybrids: liquid removes the majority of the heat, and room air removes the rest [12]. The NVL72 is one of them. Its compute trays are cooled by liquid running through manifolds to cold plates on the CPUs and GPUs, while networking and storage are air-cooled [7].
A CDU sits between the rack and the building. It connects to the facility cooling loop and supplies liquid at the temperature, pressure and chemistry the IT equipment needs [12]. ASHRAE names its liquid-cooling water classes by their upper temperature limit in degrees Celsius: W17, W27, W32, W40, W45 and W+ [13]. Warmer water lets a site reduce or avoid mechanical chillers in many climates, and the higher classes can allow dry coolers [3, 12].
What changes in a colocation contract
Wholesale colocation is priced per kW per month. CBRE reported an average asking rate of $196.25 per kW per month for 250 to 500 kW requirements in primary North American wholesale markets in the second half of 2025 [17]. At that asking rate and before energy, a GB200 NVL72 rack at 120 kW comes to $23,550 a month, about $327 per GPU. A GB300 NVL72 rack at 142 kW comes to about $27,868, or $387 per GPU. A rack with two DGX B200 systems at 28.6 kW comes to about $5,613, or $351 per GPU. These are derived from the CBRE rate and vendor power figures [5, 7, 10], for illustration only.
Per-kW pricing makes rent track power per GPU, and power per GPU changed little across these systems. Density changes which sites can host the racks. CBRE reports that operators with facilities built for superintelligence (SI), including liquid cooling and high-power-density racks, captured rent premiums over standard colocation [17].
Three terms deserve attention in a contract for dense racks:
- Power provisioned and power drawn. NVIDIA's DGX B200 tables show the gap: two 60 A circuits at 415 V with breaker derating support 66 kW, and four systems peak at 57.2 kW, leaving 8.4 kW stranded [5]. Where rent is charged on provisioned capacity, the stranded kilowatts are paid for.
- Energy. Energy can be billed on top of rent. Digital Realty reports that the vast majority of its utilities expense is passed directly to customers [18].
- Cooling grade. Liquid-cooled capacity needs CDU capacity and a way to reject the heat, either facility water or liquid-to-air units that return it to the room [9]. Air-side options are not interchangeable either: NVIDIA's DGX B200 guidance says rear-door heat exchangers and in-row coolers are not typically suitable for that system [5].
Site readiness
Before an NVL72 rack arrives, a site needs:
- A power path sized for the rack. NVIDIA's NVL72 rack uses eight power shelves of 33 kW each with N+N redundancy, converting AC to about 50 V DC on a rack busbar [7].
- A liquid loop. CDU capacity matched to the racks, a facility water class the equipment accepts, and leak detection [7, 12]. Supermicro offers an in-rack 250 kW CDU, an in-row 1.3 MW CDU, and 180 kW or 240 kW liquid-to-air units for facilities without a cooling tower or water supply [9].
- Air for the rest. Networking and storage still need air cooling [7].
- Floor capacity. Dell lists a wet cabinet weight of 1,590 kg for its GB300 NVL72 rack, on a 750 mm by 1,200 mm footprint [15]. That is about 1,770 kg per square meter of rack footprint (derived).
- Concurrent maintainability. NVIDIA's reference architecture says the data center should generally meet or exceed Uptime Institute Tier 3 or an equivalent standard, and specifies 1.2 MW of thermal design power for each scalable unit of 8 GB200 racks [8].
What comes next
NVIDIA says 54 V in-rack power distribution begins to hit physical limits as racks exceed 200 kW, and that a 1 MW rack at 54 V would need up to 200 kg of copper busbar [16]. Its stated plan is 800 V DC distribution to support 1 MW IT racks starting in 2027, alongside its Kyber rack-scale systems [16]. Capacity signed for 120 kW racks today sits on a path that NVIDIA expects to run much higher.
Read the full report
The full report, with the rack power data, the cooling and heat-rejection options, the per-kW arithmetic and the numbered sources behind every figure here, is available as a PDF.