Rent or buy GPUs: a break-even method from public inputs

Owning GPUs costs less than renting on demand only above a break-even utilization, and against committed terms the test is cost per reserved hour, built from dated public inputs.

Cover of the full report: Rent or buy GPUs: a break-even method from public inputs
The research behind this article, with every source listed. 21 pages.

Key points

From the Summary of the full report

  1. On dated public inputs, one HGX B200 GPU costs about $2.43 per hour of the year to own, or $2.84 with NVIDIA's software subscription. The inputs are an October 2026 server listing with network cards, 9.0% over five years, NVIDIA's power figure, a PUE of 1.54, August 2026 U.S. industrial electricity and CBRE's colocation rate. Staff, cluster networking, storage, insurance and tax are excluded [15, 16, 18, 24, 25, 27, 29].
  2. Against on-demand and index B200 rates on 24 October 2026, owning costs less above 17% to 44% utilization, and above 57% to 67% against CoreWeave's spot rate [3, 8, 9, 36].
  3. Against committed terms both sides pay for every hour, so the test is cost per reserved hour. Committed B200 rates run from about $2.69 per GPU-hour, derived from a 24-month contract in a filing, to $14.21 for an AWS Capacity Block [1, 13].

Whether to rent or buy GPUs comes down to two numbers: what one GPU costs to own per hour, and the rental rate for the term you would sign. Against an on-demand rate, owning costs less only above a break-even utilization, the share of the year's hours the hardware does useful work. Against a committed term, the renter also pays for every reserved hour, so utilization drops out and the test becomes cost per reserved hour [14].

Built from dated public inputs, owning one HGX B200 GPU costs about $2.43 an hour at full use, or $2.84 with NVIDIA's software subscription, before staff, cluster networking and insurance [15, 16, 18, 24, 25, 27, 29]. Break-even utilization against on-demand and index B200 rates on 24 October 2026 runs from 17% to 44% [3, 8, 9, 36]. Committed B200 rates span about $2.69 to $14.21 per GPU-hour [1, 13].

Every worked number below is our arithmetic and illustrates the method.

Rent or buy GPUs: hourly cost to own

The method borrows the shape of the simple levelized cost of energy from the National Laboratory of the Rockies [34]. A capital recovery factor (CRF) turns a purchase price into an equal yearly charge that repays the price with interest over a set life. For an interest rate i over n years, CRF = i(1 + i)^n ÷ ((1 + i)^n - 1) [34]. Utilization takes the place of the energy formula's capacity factor:

Owning cost per used hour = (price × CRF + fixed yearly costs) ÷ (8,760 × utilization) + variable cost per used hour

This note charges power at full draw every hour, as a fixed cost, so break-even utilization is the owning cost at full use divided by the rental rate. CBRE reports that minimum power floors of 60% to 85% of allocated power are becoming increasingly common in U.S. colocation contracts [28].

Inputs for one HGX B200 GPU, with dates

Input Value used Source and date
Server price $443,278 for 8 GPUs plus eight 400G ConnectX-7 cards at $1,815: $57,225 per GPU Exxact configurator listing, 24 Oct 2026 [18]
Life 5 years Book lives: WhiteFiber 5, CoreWeave 6 [13, 14]
Financing rate 9.0% IREN, fixed rate, non-investment-grade GPU financing, Aug 2026 [15]
Power draw 14.3 kW maximum for 8 GPUs, 1.79 kW per GPU NVIDIA DGX B200 specification [16]
Power usage effectiveness (PUE) 1.54 Uptime Institute 2025 survey, weighted average [25]
Electricity 9.64 cents per kWh EIA, U.S. industrial average, Aug 2026, preliminary [24]
Colocation $196.25 per kW-month CBRE, 250 to 500 kW in primary North American markets, H2 2025 [27]
Software, optional $18,000 per GPU for 5 years NVIDIA AI Enterprise list price [29]
Cost line Per GPU-hour at full use
Capital: $57,225 × CRF 0.2571 ÷ 8,760 $1.68
Power: 1.79 kW × 1.54 × $0.0964 $0.27
Colocation: 1.79 kW × $196.25 × 12 ÷ 8,760 $0.48
Owning cost $2.43
With the software subscription ($0.41) $2.84

Sources: [15, 16, 18, 24, 25, 27, 29, 34]. The arithmetic is ours.

Treat this as a floor for GPU total cost of ownership. It leaves out network switches and cables, racks and installation, which the configurator does not offer [18], as well as staff, storage and insurance. Where a colocation rate already covers cooling, the PUE uplift counts it twice. What an HGX server price includes covers the hardware scope, and rack power and liquid cooling covers the space bill.

Break-even utilization against on-demand rates

B200 rate, 24 Oct 2026 Per GPU-hour Break-even utilization With software
AWS p6-b200, on-demand, N. Virginia $14.24 17% 20%
CoreWeave HGX B200, on-demand, North America $8.60 28% 33%
Lambda 8-GPU B200 instance, on-demand $6.69 36% 42%
Silicon Data B200 neocloud index $6.45 38% 44%
CoreWeave HGX B200, spot $4.26 57% 67%

Sources: [3, 8, 9, 36]. Break-even is owning cost divided by the rate.

A 2024 study of two research clusters with 24,000 A100 GPUs reported average utilization of 83% and 85% [30]. At 85%, owning costs about $2.85 per used hour. At 30%, about $8.08.

Committed terms: compare cost per reserved hour

CoreWeave's annual report describes its committed contracts as typically take-or-pay, "requiring payment regardless of the level of utilization" [14]. An owner pays regardless too, so compare $2.43 to $2.84 with each committed rate.

Committed B200 option Per GPU-hour What the commitment buys
WhiteFiber service order, 384 GPUs, 24 months, Jan 2026 about $2.69, derived Reported contract, may include services [13]
CoreWeave committed usage from $3.44 Up to 60% off on-demand, by inquiry [8]
AWS EC2 Instance Savings Plan, 3 years $5.35 to $6.15 Committed spend, no capacity reservation [4, 5]
Lambda 1-Click Clusters, 2 weeks to 1 year $8.87 to $9.86 Cluster with InfiniBand fabric and head nodes [9, 10]
AWS EC2 Capacity Block $14.21 Reserved capacity, up to six months, prepaid [1, 2]

The WhiteFiber figure is our arithmetic, $18.1 million over 384 GPUs and 17,520 hours [13], and sits inside the owning range once software is counted. The CoreWeave figure applies the full stated discount [8].

A longer commitment is not always cheaper per hour. AWS's B200 Capacity Block rate sits 0.2% below its on-demand rate [1, 3], and Lambda's B200 clusters cost more per GPU-hour than its 8-GPU instance [9]. A Capacity Block reserves instances for up to six months [2], a Lambda cluster adds a 400 Gb/s InfiniBand fabric and three management nodes [10], and a Savings Plan reserves no capacity [5].

A committed term also ends first: a 24-month order covers 40% of a five-year life. The rent-to-value note covers residual value in its full report.

Rental options outweigh ownership costs

Moving any one ownership input across its sourced range shifts B200 owning cost by no more than $0.47 per GPU-hour.

Input moved Range from sources Owning cost at full use
Server price per GPU $54,167 to $65,324 $2.34 to $2.66
Life 6 to 5 years $2.20 to $2.43
Financing rate 6.0% to 9.0% $2.30 to $2.43
Electricity 7.21 to 24.12 cents per kWh $2.36 to $2.82
Colocation $190 to $235 per kW-month $2.41 to $2.52

Sources: [13, 14, 15, 18, 19, 21, 24, 25, 26, 27]. The base case is $2.43.

Rental rates move far more. B200 rates in these sources span $2.69 to $14.24 per GPU-hour [3, 13], and H100 rates, posted and reported, span $1.40 to $12.29 by provider, term and pricing type.

H100 rate Per GPU-hour
Azure ND H100 v5, pay-as-you-go, East US $12.29
Azure, 1-year reservation $7.87
AWS p5, on-demand $6.88
AWS Capacity Block $5.97
Lambda 8-GPU instance $3.99
AWS Instance Savings Plan, 3 years, all upfront $2.59
SemiAnalysis 1-year contract index, March 2026 $2.35
WhiteFiber 24-month order, March 2026, derived about $1.40

Sources: [1, 3, 4, 6, 9, 12, 13]. Viewed 24 Oct 2026 unless dated. Azure reservations are whole-term prices divided by the term's hours.

For Hopper, the report's HGX H200 case costs $2.09 per GPU-hour to own at full use, a 26% break-even against AWS's p5en on-demand rate [3, 17, 19, 20].

SemiAnalysis reports that the majority of GPU rental capacity trades on contracts of six months or longer, negotiated bilaterally and seldom posted [12]. A break-even against on-demand list prices alone leaves them out.

On-premises versus cloud: costs left out

  • Staff. The median wage for network and computer systems administrators was $99,130 in May 2025 [33], or $11.32 per hour of the year, spread over the GPUs one person runs.
  • Failures. A 2024 report on a 54-day period of a training run on up to 16,000 H100 GPUs counted 419 unexpected interruptions, 58.7% of them from GPU issues [31].
  • Fabric and fit-out. The listing leaves these out [18]. IREN's July 2025 purchase of about 2,400 B200 and B300 GPUs for about $130 million included servers, storage, labor, InfiniBand, racks and cabling [21]: about $54,200 per GPU, below the single-server listing, at bulk volume.
  • Tax. IRS Publication 946 reports that P.L. 119-21 reinstated 100% special depreciation for certain qualified property acquired and placed in service after 19 January 2025 [32]. This note works before tax.

For a team that buys, Rillor arranges equipment leases, GPU-backed loans and sale-leasebacks, matched to the deployment and to what lenders need to see.

The Rillor Compute Index measures what GPU compute costs to rent and to own under a published methodology. Its RCI Rental series breaks prices out by GPU class, region, term and pricing type, and RCI Hardware by comparable system grade, the two inputs this method compares [35].

Read the full report

The full report, with an H200 worked case, the formula with power as a variable cost, each input's source type and the complete source list, is available as a PDF.

The full report

Rent or buy GPUs: a break-even method from public inputs

The research behind this article, with every source listed. 21 pages.

  1. Summary
  2. Background
  3. Method
  4. Findings
  5. Implications
  6. Limits of this analysis
  7. Sources

Sources

  1. Amazon EC2 Capacity Blocks for ML pricing. Amazon Web Services, viewed 24 October 2026. https://aws.amazon.com/ec2/capacityblocks/pricing/
  2. Amazon EC2 Capacity Blocks for ML. Amazon Web Services, viewed 24 October 2026. https://aws.amazon.com/ec2/capacityblocks/
  3. Amazon EC2 On-Demand price data, US East (N. Virginia), Linux. Amazon Web Services, published 23 October 2026. https://b0.p.awsstatic.com/pricing/2.0/meteredUnitMaps/ec2/USD/current/ec2-ondemand-without-sec-sel/US%20East%20%28N.%20Virginia%29/Linux/index.json
  4. AWS Price List, Savings Plans for Compute, US East (N. Virginia), version 20261023221239. Amazon Web Services, published 23 October 2026. https://pricing.us-east-1.amazonaws.com/savingsPlan/v1.0/aws/AWSComputeSavingsPlan/20261023221239/us-east-1/index.json
  5. Compute Savings Plans and Reserved Instances. Savings Plans User Guide, Amazon Web Services, viewed 24 October 2026. https://docs.aws.amazon.com/savingsplans/latest/userguide/sp-ris.html
  6. Azure Retail Prices API, query for Standard_ND96isr_H100_v5 in East US. Microsoft, viewed 24 October 2026. https://prices.azure.com/api/retail/prices?$filter=armSkuName%20eq%20%27Standard_ND96isr_H100_v5%27%20and%20armRegionName%20eq%20%27eastus%27
  7. Pricing. CoreWeave, viewed 24 October 2026. https://www.coreweave.com/pricing
  8. GPU cloud pricing, archived capture of 25 October 2026 showing the rates viewed on 24 October 2026. Lambda, via the Internet Archive Wayback Machine, viewed 7 November 2026. https://web.archive.org/web/20261025040216/https://lambda.ai/pricing
  9. 1-Click Clusters: Introduction. Lambda Docs, viewed 24 October 2026. https://docs.lambda.ai/public-cloud/1-click-clusters/
  10. The Great GPU Shortage: Rental Capacity: Launching our H100 1 Year Rental Price Index. SemiAnalysis, 2 April 2026. https://newsletter.semianalysis.com/p/the-great-gpu-shortage-rental-capacity
  11. WhiteFiber, Inc. Quarterly Report on Form 10-Q for the quarter ended 30 June 2026. U.S. Securities and Exchange Commission, filed 12 August 2026. https://www.sec.gov/Archives/edgar/data/2042022/000121390026088026/ea0300877-10q_whitefiber.htm
  12. CoreWeave, Inc. Annual Report on Form 10-K for the year ended 31 December 2025. U.S. Securities and Exchange Commission, filed 2 March 2026. https://www.sec.gov/Archives/edgar/data/1769628/000176962826000104/crwv-20251231.htm
  13. IREN Reports FY26 Results (Exhibit 99.1 to Form 8-K). IREN, 27 August 2026. https://www.sec.gov/Archives/edgar/data/0001878848/000187884826000051/irenreportsfy26results.htm
  14. NVIDIA DGX B200. NVIDIA, viewed 24 October 2026. https://www.nvidia.com/en-us/data-center/dgx-b200/
  15. Introduction to NVIDIA DGX H100/H200 Systems. NVIDIA DGX H100/H200 User Guide, viewed 24 October 2026. https://docs.nvidia.com/dgx/dgxh100-user-guide/introduction-to-dgxh100.html
  16. Exxact TensorEX 8U HGX B200 Server TS4-142487900, configurator. Exxact Corporation, viewed 24 October 2026. https://configurator.exxactcorp.com/configure/TS4-142487900
  17. GPX GXS6-2808-8HGX-B2, configurator. Thinkmate, viewed 24 October 2026. https://www.thinkmate.com/system/gpx-gxs6-2808-8hgx-b2
  18. GPX GPU-Optimized Servers. Thinkmate, viewed 24 October 2026. https://www.thinkmate.com/systems/servers/gpx
  19. IREN Expands AI Cloud with 2.4k NVIDIA Blackwell GPUs (Exhibit 99.1 to Form 8-K). IREN, 3 July 2025. https://www.sec.gov/Archives/edgar/data/1878848/000114036125024747/ef20051566_ex99-1.htm
  20. Electric Power Monthly, Table 5.6.A, Average Price of Electricity to Ultimate Customers by End-Use Sector, by State, August 2026 and 2025. U.S. Energy Information Administration, released 23 October 2026. https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_a
  21. Uptime Institute Global Data Center Survey 2025 (UII Keynote Report 180). Uptime Institute, July 2025. https://datacenter.uptimeinstitute.com/rs/711-RIA-145/images/2025.Annual.Survey.Report.pdf
  22. Global Data Center Trends 2026. CBRE, 17 June 2026. https://www.cbre.com/insights/reports/global-data-center-trends-2026
  23. North America Data Center Trends H2 2025. CBRE, 25 February 2026. https://www.cbre.com/insights/books/north-america-data-center-trends-h2-2025
  24. North America Data Center Trends H1 2026. CBRE, 27 August 2026. https://www.cbre.com/insights/books/north-america-data-center-trends-h1-2026
  25. NVIDIA AI Enterprise pricing. NVIDIA Enterprise Licensing Guide, viewed 24 October 2026. https://docs.nvidia.com/ai-enterprise/planning-resource/licensing-guide/latest/pricing.html
  26. Revisiting Reliability in Large-Scale Machine Learning Research Clusters (Apostolos Kokolis, Michael Kuchnik, John Hoffman and others). arXiv, 29 October 2024. https://arxiv.org/html/2410.21680v1
  27. The Llama 3 Herd of Models (Aaron Grattafiori and others), version 3. arXiv, 23 November 2024. https://arxiv.org/html/2407.21783v3
  28. Publication 946 (2025), How To Depreciate Property. Internal Revenue Service, viewed 24 October 2026. https://www.irs.gov/publications/p946
  29. Network and Computer Systems Administrators, Occupational Outlook Handbook. U.S. Bureau of Labor Statistics, viewed 24 October 2026. https://www.bls.gov/ooh/computer-and-information-technology/network-and-computer-systems-administrators.htm
  30. Simple Levelized Cost of Energy (LCOE) Calculator Documentation. National Laboratory of the Rockies, Energy Systems Analysis, last updated 6 December 2025. https://www.nlr.gov/analysis/tech-lcoe-documentation
  31. Rillor Compute Index. Rillor Corporation, viewed 24 October 2026. https://rillor.com/markets/compute-index
  32. B200 Rental Price Index (SDB200RT). Silicon Data, viewed 24 October 2026. https://www.silicondata.com/products/silicon-index/b200

Notices

Rillor is not a registered investment adviser or commodity trading advisor and does not provide investment or trading advice. Research, forecasts, data and software described on this site are for research and engineering use. Nothing here is an offer or recommendation to buy or sell any security, commodity interest or digital asset. Past or simulated results do not indicate future results.

Rillor Compute Index series are for research and planning use. They are not offered for settlement of any contract.

NVIDIA, AMD, Ceph, Kubernetes and related product names are trademarks of their owners and are used only to identify products. No affiliation or endorsement is implied.