ExplainerGPU and neocloud pricing

What to check before signing a GPU cloud contract

A GPU cloud provider checklist built from published service level agreements, reservation terms, filed contracts and acceptance tests: what each term covers and who pays when hardware fails.

Cover of the full report: What to check before signing a GPU cloud contract
The research behind this article, with every source listed. 19 pages.

Key points

From the Summary of the full report

  1. The Llama 3 Herd of Models (2024), a published account of pre-training on up to 16K H100 GPUs, logged 419 unexpected interruptions in 54 days, about 78% of them from confirmed or suspected hardware issues [1].
  2. Published service level agreements (SLAs) define downtime differently. AWS, Google Cloud and Oracle write theirs around external connectivity, Google adding disk access, and Nebius also counts a failed GPU or lost NVLink or fabric connectivity [3, 4, 5, 7].
  3. The six published SLAs reviewed pay service credits, in steps that start at 10% except at Oracle's single-instance level, and the SLA documents of AWS, Google Cloud, Oracle, DigitalOcean and Voltage Park call credits the sole or exclusive remedy [3, 4, 5, 7, 8, 9].
  4. Rack-scale systems need a rack definition. Nebius's rack SLA covers 16 of the 18 nodes in its NVL72 racks, and SemiAnalysis's ClusterMAX 3.0 rating describes a common pattern where 3 or more failed nodes put the rack down [7, 11].

A GPU cloud provider checklist starts from one question: who pays when hardware fails. At cluster scale, failure is routine. The Llama 3 Herd of Models, a 2024 published account of pre-training on up to 16K H100 GPUs, logged 466 job interruptions in 54 days, 419 of them unexpected and about 78% of those from confirmed or suspected hardware issues [1]. This explainer reads the published service level agreements (SLAs), filed contracts and reservation terms that decide what a buyer pays while that happens, each as last viewed on 8 or 14 November 2026. It is research, never legal advice, and any contract is for counsel to review.

Failures come faster as jobs grow. A published account from 2024 of 11 months in two A100 research environments measured a mean time to failure of 7.9 hours for 1,024-GPU jobs, against 47.7 days for 8-GPU jobs [2]. Checkpoints and restarts on interruptible capacity are covered in what research shows about training on spot GPUs.

What a published GPU cloud SLA covers

Each SLA sets a monthly uptime commitment for a unit it defines and says what counts as down.

Document and date Unit Commitment What counts as down
AWS Compute SLA, 25 May 2022 Single instance 99.5% "no external connectivity" [3]
Google Compute Engine SLA, 14 October 2026 Single instance 99.9%, or 99.95% memory-optimized Loss of external connectivity or persistent disk access [4]
Oracle pillar document, October 2026 GPU compute SKUs 99.9% A problem that prevents external connectivity [5]
Nebius, effective 6 October 2026 Virtual machine or rack 99.50% A failed GPU, lost NVLink or fabric connectivity, among other conditions [7]
DigitalOcean GPU Droplets, 21 October 2025 Server node 99% No external connectivity in a 5-minute interval [8]
Voltage Park, 5 January 2025 Virtual machine or node 99.5% Unavailability, for example from hardware failure [9]

AWS, Google Cloud, Oracle and DigitalOcean test external connectivity, Google adds disk access, and Nebius names conditions inside the machine [3, 4, 5, 7, 8].

Each allowance applies to one unit. At 99.5% a single instance can be down 3.6 hours in a 30-day month before any credit is due (derived) [3, 7, 9]. DigitalOcean measures uptime "at the server node level, rather than at the cluster level" [8], while a job spread across many nodes meets failures far more often than any one of them [2]. The clock matters too: DigitalOcean and Voltage Park count downtime from the customer's report [8, 9].

Credits, claim windows and liability caps

The remedy in every SLA above is a service credit, in steps that start at 10%, except Oracle's single-instance credit of 100% below 99.9% [3, 4, 5, 7, 8, 9]. AWS applies credits only against future EC2 payments, with no right to a refund [3]. Oracle's Pay as You Go credits expire at the end of the month they are granted, and DigitalOcean's after 90 days [5, 8]. AWS, Google Cloud, Oracle, DigitalOcean and Voltage Park each call credits the sole or exclusive remedy [3, 4, 5, 8, 9].

Credits also need a claim on time. AWS sets the end of the second billing cycle after the incident, Google and Oracle 60 days and Voltage Park 30 days [3, 4, 5, 9]. DigitalOcean requires written notice within 24 hours of the downtime, without which the right to credits is forfeited, and a credit request within three months of the end of the downtime's billing cycle [8].

The AWS Customer Agreement gives at least 90 days' notice of adverse SLA changes, and both AWS's and Google's online terms cap liability at the fees paid for the services in the prior 12 months [14, 15]. Google's terms state that they do not apply to a customer that signed an offline variant [15]. A filed order form shows a negotiated difference: unapplied credits are paid out on request or at termination [19]. Lenders read the same credit and termination clauses from the other side, as set out in what makes a GPU capacity contract financeable.

Rack-scale systems: when a rack counts as down

On a GB200 NVL72, "a single faulty component can require draining an entire 72-GPU rack", in the words of SemiAnalysis's ClusterMAX 2.0 rating [10]. It describes three rack SLA approaches, one pairing a 99% node SLA with a 95% rack SLA, where a working rack is "16 of the 18 nodes, or 64 of 72 GPUs" [10]. ClusterMAX 3.0 calls a common pattern "NVL64+": an SLA on each node, with the whole rack down once 3 or more of its 18 nodes fail at a given time [11].

Nebius's rack-scale SLA covers 16 of the 18 nodes in a GB300 NVL72 or Vera Rubin NVL72 rack and keeps 2 as a maintenance buffer that the customer may use but that does not count toward uptime [7]. On HGX systems, ClusterMAX 3.0 expects detection in about 2 minutes and replacement in under an hour [11].

Acceptance before billing starts

Three contracts filed with the U.S. Securities and Exchange Commission (SEC) tie payment to acceptance. A statement of work between an IREN subsidiary and Microsoft gives Microsoft 5 days to test, the supplier 15 business days to cure a rejection, and deems capacity accepted without a timely rejection [17]. A form of statement of work between Microsoft and an Nscale subsidiary gives 35 days for the first GPU service and 5 days for later ones [18]. In the Nscale order form with a model developer customer, no fees are payable for a tranche until the customer accepts all of it in writing [19].

The tests named are public: GPU diagnostics, memory tests, HPL-MxP, HPCG and NCCL validation [17, 18]. NVIDIA's DCGM Diagnostics, in a guide last updated 17 June 2026, run at four levels, the longest under 2.25 hours on an 8-GPU Hopper system [20]. NCCL Tests "check both the performance and the correctness of NCCL operations" [21]. ClusterMAX 3.0's SLA template adds termination rights for the buyer when an agreed acceptance date is missed [11].

Billing during failures and maintenance

EC2 bills an instance from the moment it is running, per second with a one-minute minimum, idle or not [23]. Azure does not bill a VM while it is being created [25]. Under its SLA, AWS does not charge for any clock hour in which a single instance is unavailable for more than six minutes, and this applies automatically [3].

Maintenance stops GPU machines on a schedule. On Compute Engine, GPU instances cannot be live migrated, host maintenance events typically occur once every two weeks with 1 hour of notice, and Local SSD data is lost when the instance stops for one [26].

Filed contracts go further. In the CoreWeave and Microsoft master services agreement, fees for services not performed are cancelled once a hardware failure lasts two consecutive business days [16]. ClusterMAX counts charging for GPU hours during cluster creation or hardware failure as a critical failure [10, 11].

Reservations, cancellation and exit

AWS Capacity Blocks cannot be cancelled, moved or split, are paid up front and end at 11:30 UTC [27, 29]. A future-dated AWS Capacity Reservation has a minimum commitment of 14 days for most instance types, and a cancellation charge might apply [30]. Google's future reservations in calendar mode can be cancelled only if the start is more than 30 days away, or within 24 hours of approval with the start at least four days away [32]. Microsoft caps refunds of Azure reservations at USD 50,000 of cancelled commitments in a rolling 12 months [34]. Which reservation holds which GPUs is covered in why cloud GPU launches fail and how reservations hold capacity.

In the CoreWeave and Microsoft agreement, a customer that terminates for cause gets its prepaid fees for the rest of the term refunded [16]. The EU Data Act requires switching rights in a written contract, a transition of at most 30 calendar days and data retrieval of at least 30 calendar days, and from 12 January 2027 bars switching charges [35]. Exit and egress charges as published are itemized in GPU cloud costs beyond the hourly rate.

Price terms in a quote

The Nscale order form writes the monthly payment as hours times GPUs times the price per GPU-hour, minus service credits and late delivery discounts [19]. For example, a 1,024-GPU tranche in a 30-day month comes to 737,280 GPU-hours before credits (derived) [19]. Capacity reservations and resource-based commitments bill whether used or not [6, 31, 33], and a Capacity Block's price is fixed when it is reserved [28]. Rillor's GPU and neocloud pricing data is used to check a cloud quote against what providers publish.

A GPU cloud provider checklist, term by term

  • Uptime: the unit covered, the percentage and the hours it allows [3, 4, 5, 7, 8, 9].
  • Down: whether the definition names GPU and fabric conditions or only connectivity [3, 4, 5, 7].
  • Credits: steps, base, expiry, payout, claim deadline and evidence [3, 4, 5, 8, 19].
  • Racks: the node count that puts a rack down, the buffer, and detection and replacement times [7, 10, 11].
  • Acceptance: named tests, pass thresholds, acceptance and cure periods, and billing from acceptance [17, 18, 19].
  • Failure billing: when failed hardware stops being billed, and maintenance notice [3, 16, 26].
  • Reservations: term, start, cancellation and end time [27, 30, 32, 33].
  • Exit: termination rights, refunds, switching periods and charges [16, 35].
  • Changes: notice of SLA changes and the liability cap [14, 15].

Read the full report

The full report adds every credit step and claim window, the acceptance terms of the filed contracts and the reservation terms side by side.

The full report

What to check before signing a GPU cloud contract

The research behind this article, with every source listed. 19 pages.

  1. Summary
  2. Background
  3. Method
  4. Findings
  5. Implications
  6. Limits of this analysis
  7. Sources

Sources

  1. The Llama 3 Herd of Models. arXiv 2407.21783 v3, last revised 23 November 2024 (first version 31 July 2024), viewed 8 November 2026. https://arxiv.org/abs/2407.21783
  2. Revisiting Reliability in Large-Scale Machine Learning Research Clusters. arXiv 2410.21680 v2, last revised 6 February 2025 (first version 29 October 2024), viewed 8 November 2026. https://arxiv.org/abs/2410.21680
  3. Amazon Compute Service Level Agreement. Amazon Web Services, last updated 25 May 2022, viewed 8 November 2026. https://aws.amazon.com/compute/sla/
  4. Compute Engine Service Level Agreement (SLA). Google Cloud, last modified 14 October 2026, viewed 8 November 2026. https://cloud.google.com/compute/sla
  5. Oracle PaaS and IaaS Public Cloud Services Pillar Document. Oracle, October 2026, viewed 14 November 2026. https://www.oracle.com/contracts/docs/paas_iaas_pub_cld_srvs_pillar_4021422.pdf
  6. On-demand capacity reservation in Azure. Microsoft Learn, last updated 16 June 2026, viewed 8 November 2026. https://learn.microsoft.com/en-us/azure/virtual-machines/capacity-reservation-overview
  7. Service Level for Compute Cloud. Nebius AI Cloud, effective 6 October 2026, viewed 8 November 2026. https://docs.nebius.com/legal/sla-levels/compute
  8. DigitalOcean GPU Droplet SLA. DigitalOcean, last updated 21 October 2025, viewed 8 November 2026. https://www.digitalocean.com/sla/gpu-droplets
  9. Service Level Agreements (Virtual Machine SLA and Node SLA). Voltage Park, last revised 5 January 2025, viewed 8 November 2026. https://voltagepark.com/virtual-machine-sla
  10. ClusterMAX 2.0: The Industry Standard GPU Cloud Rating System. SemiAnalysis, 6 November 2025, viewed 8 November 2026. https://newsletter.semianalysis.com/p/clustermax-20-the-industry-standard
  11. ClusterMAX 3.0: The Industry Standard GPU Cloud Rating System Returns. SemiAnalysis, 23 September 2026, viewed 8 November 2026. https://newsletter.semianalysis.com/p/clustermax-30-the-industry-standard
  12. AWS Customer Agreement. Amazon Web Services, last updated 29 October 2026, viewed 8 November 2026. https://aws.amazon.com/agreement/
  13. Google Cloud Terms of Service. Google Cloud, last modified 12 October 2026, viewed 8 November 2026. https://cloud.google.com/terms
  14. Master Services Agreement between CoreWeave, Inc. and Microsoft Corporation (Exhibit 10.23 to CoreWeave Form S-1). U.S. Securities and Exchange Commission, filed 3 March 2025, viewed 8 November 2026. https://www.sec.gov/Archives/edgar/data/1769628/000119312525044231/d899798dex1023.htm
  15. Partner Statement of Work between IE US Hardware 3 Inc. (an IREN subsidiary) and Microsoft (Exhibit 10.3 to IREN Limited Form 10-Q). U.S. Securities and Exchange Commission, filed 5 February 2026, viewed 8 November 2026. https://www.sec.gov/Archives/edgar/data/1878848/000187884826000015/exhibit103-partnerstatem.htm
  16. Form of Partner Statement of Work between Microsoft and an Nscale subsidiary (Exhibit 10.19 to Nscale Limited Form S-1). U.S. Securities and Exchange Commission, filed 18 September 2026, viewed 8 November 2026. https://www.sec.gov/Archives/edgar/data/2110365/000119312526395475/ck0002110365-ex10_19.htm
  17. Form of Order for GPU Services between a model developer customer and an Nscale subsidiary (Exhibit 10.25 to Nscale Limited Form S-1). U.S. Securities and Exchange Commission, filed 18 September 2026, viewed 8 November 2026. https://www.sec.gov/Archives/edgar/data/2110365/000119312526395475/ck0002110365-ex10_25.htm
  18. DCGM Diagnostics. NVIDIA DCGM Documentation, NVIDIA, last updated 17 June 2026, viewed 8 November 2026. https://docs.nvidia.com/datacenter/dcgm/latest/user-guide/dcgm-diagnostics.html
  19. NCCL Tests. NVIDIA, GitHub, viewed 8 November 2026. https://github.com/NVIDIA/nccl-tests
  20. Amazon EC2 instance state changes. Amazon EC2 User Guide, Amazon Web Services, viewed 8 November 2026. https://docs.aws.amazon.com/AWSEC2/latest/UserGuide/ec2-instance-lifecycle.html
  21. States and billing status of Azure Virtual Machines. Microsoft Learn, last updated 22 August 2024, viewed 8 November 2026. https://learn.microsoft.com/en-us/azure/virtual-machines/states-billing
  22. Handle GPU host maintenance events. Compute Engine documentation, Google Cloud, last updated 10 November 2026, viewed 14 November 2026. https://cloud.google.com/compute/docs/gpus/gpu-host-maintenance
  23. Capacity Blocks for ML. Amazon EC2 User Guide, Amazon Web Services, viewed 8 November 2026. https://docs.aws.amazon.com/AWSEC2/latest/UserGuide/ec2-capacity-blocks.html
  24. How Amazon EC2 Capacity Blocks work. Amazon EC2 User Guide, Amazon Web Services, viewed 8 November 2026. https://docs.aws.amazon.com/AWSEC2/latest/UserGuide/capacity-blocks-how.html
  25. Capacity Blocks pricing and billing. Amazon EC2 User Guide, Amazon Web Services, viewed 8 November 2026. https://docs.aws.amazon.com/AWSEC2/latest/UserGuide/capacity-blocks-pricing-billing.html
  26. Concepts for Amazon EC2 Capacity Reservations. Amazon EC2 User Guide, Amazon Web Services, viewed 8 November 2026. https://docs.aws.amazon.com/AWSEC2/latest/UserGuide/cr-concepts.html
  27. Capacity Reservation pricing and billing. Amazon EC2 User Guide, Amazon Web Services, viewed 8 November 2026. https://docs.aws.amazon.com/AWSEC2/latest/UserGuide/capacity-reservations-pricing-billing.html
  28. About future reservation requests in calendar mode. Compute Engine documentation, Google Cloud, last updated 10 November 2026, viewed 14 November 2026. https://cloud.google.com/compute/docs/instances/future-reservations-calendar-mode-overview
  29. Committed use discounts (CUDs) for Compute Engine. Compute Engine documentation, Google Cloud, last updated 12 November 2026, viewed 14 November 2026. https://cloud.google.com/compute/docs/instances/committed-use-discounts-overview
  30. Self-service exchanges and refunds for Azure Reservations. Microsoft Learn, updated 29 July 2026, viewed 8 November 2026. https://learn.microsoft.com/en-us/azure/cost-management-billing/reservations/exchange-and-refund-azure-reservations
  31. Regulation (EU) 2023/2854 of 13 December 2023 (Data Act). Official Journal of the European Union, OJ L, 2023/2854, 22 December 2023, Publications Office of the European Union, viewed 14 November 2026. https://publications.europa.eu/resource/celex/32023R2854

Notices

Rillor is not a registered investment adviser or commodity trading advisor and does not provide investment or trading advice. Research, forecasts, data and software described on this site are for research and engineering use. Nothing here is an offer or recommendation to buy or sell any security, commodity interest or digital asset. Past or simulated results do not indicate future results.

NVIDIA, AMD, Ceph, Kubernetes and related product names are trademarks of their owners and are used only to identify products. No affiliation or endorsement is implied.

Tell us which GPU classes you track.

Send the GPU classes, regions and pricing types you need, and how often you need them.

Request pricing data